본문으로 가기 주메뉴로 가기 카피라이트로 가기

News

Hanyang University International Hospital

News

Post details : title, date, attachments, content

Emergency Treatment Beds for Critically Ill Patients Open

Date
2021-06-01

President Yoon Hojoo

Hanyang University Hospital (President Yoon Hojoo) will begin full-scale operation of ‘Emergency Treatment Beds for Critically Ill Patients’ from June 1 in response to the increase in critically ill patients with high-risk infectious diseases such as COVID-19. To this end, the hospital newly remodeled the ward on the 18th floor of the Main Building into dedicated treatment beds and held an opening ceremony for the ‘Emergency Treatment Beds for Critically Ill Patients’ on May 28.

 

The ‘Emergency Treatment Beds for Critically Ill Patients’ were designed so that the entire ward, including the 25 beds, corridor anterooms, negative-pressure corridors, a PPE doffing room, an equipment disinfection room, shower rooms and a nurses' room, can be thoroughly controlled under negative pressure. The nurses' station, which is equipped with a central control system, has a setup that allows staff to grasp the health status of all patients at a glance and respond quickly to on-site situations.

 

In addition, for comfortable patient rooms, the hospital installed a system for checking optimal temperature and humidity, as well as an air purification system with HEPA filters to maintain air cleanliness equivalent to that of a clean room (0.3 μm, 99.97%).

 

Ventilators have also been introduced for patients who have difficulty breathing on their own due to dyspnea or respiratory failure, making it possible to provide care equivalent to that of an intensive care unit.

 

President Yoon Hojoo said, “Our hospital's emergency treatment beds for critically ill patients are equipped with an optimal treatment environment so that patients with high-risk infectious diseases occurring on a large scale, such as COVID-19, can receive safe medical services,” adding, “We will continue to do our utmost in treating critically ill patients with high-risk infectious diseases through the education and training of medical personnel.”

 

The ‘Emergency Treatment Beds for Critically Ill Patients’ project was selected and carried out under a support program of the Ministry of Health and Welfare, and the beds will be converted for use as specialized infectious disease treatment beds when necessary, such as during a national infectious disease crisis.

 

Once the elevator dedicated to the emergency treatment beds, scheduled for completion at the end of 2021, is completed, the ward will be cut off from the outside, and the movement paths of infected and non-infected patients and medical staff will be completely separated.